Carnival Sunshine
Works carried out for:
SEASTEMA
Installation system for local entertainment.
FINCANTIERI
Installation of ship name sign lighting and other systems.
F.LLI BUDAI
Dismantling of some flooring areas in teak.
Carnival Destiny
Works carried out for:
C.E.I.N.
Assistance during dry-dock for maintenance on furnishing (U.S.A.).
Carnival Triumph
Works carried out for:
C.E.I.N.
Assistance during dry-dock for maintenance on furnishing (U.S.A.).
FINCANTIERI / CARNIVAL
Assistance on the new plant systems following the fire on board in February 2012.
Carnival Conquest
Works carried out for:
FINCANTIERI
Assistance during dry-dock for furnishing maintenance and plant system (U.S.A.).
C.E.I.N.
Assistance during dry-dock for maintenance on furnishing (U.S.A.).
CARNIVAL CORPORATION – BASILICO LTD
Repairs and makeover of the swimming pool areas (U.S.A.).
Carnival Glory
Works carried out for:
FINCANTIERI
Supply of glass mosaics and assistance during dry-dock for maintenance on furnishing and plant system (U.S.A.).
Carnival Valor
Works carried out for:
FINCANTIERI
Assistance during dry-dock for maintenance on the cabin ceilings (U.S.A.).
F.LLI BUDAI
Mounting of handrails, stairs, floors, coverings, doors and other teak products (ITALY).
ITA
Study, design and installation of prefabricated cabins (ITALY).
MARINONI
Laying of special materials, resins and carpentry (ITALY).
C.E.I.N.
Assistance during dry-dock for maintenance on furnishing (U.S.A.).
Carnival Liberty
Works carried out for:
FINCANTIERI
Supply of stainless steel profiles and fire-proof doors, supply and laying of PVC grids for the swimming pool (ITALY).
Supply of thresholds for stainless steel doors (ITALY).
Assistance during dry-dock for maintenance on furnishing and plant system (U.S.A.)
MARINONI
Laying of special materials, resins and carpentry. (ITALY)
CARNIVAL - BASILICO LTD
Repair and make over of the swimming pool areas (U.S.A. 2011).
Carnival Freedom
Works carried out for:
F.LLI BUDAI
Mounting of handrails, stairs, floors, covering, doors and other teak products (ITALY).
MARINONI
Laying of special materials, resins and carpentry. (ITALY)
Carnival Splendor
Works carried out for:
F.LLI BUDAI
Mounting of handrails, stairs, floors, covering, doors and other teak products (ITALY).
MARINONI
Laying of special materials, resins and carpentry. (ITALY)
SEANET GROUP
Mounting of hydraulic systems for the opening of the watertight doors and external doors
(ITALY).
NUOVO ARSENALE CARTUBI
Supply of stainless steel grids and related accessories (U.S.A. 2010).
Carnival Dream
Works carried out for:
FINCANTIERI
Supply of stainless steel profiles for toilet units doors, supply and installation of a structure for window mountings in the spa area, modification of iron stairs, assistance with assembly of Sleev-it, supply and assembly of stainless steel components, stainless steel ramps, supply and mounting of painted galvanized steel walls ( ITALY).
Supply and replacement open deck ceilings aft deck 10 (2010 USA).
Supply and mounting of electrical system (2010 USA).
F.LLI BUDAI
Mounting of handrails, stairs, floors, covering, doors and other teak products (ITALY).
MARINONI
Laying of special materials, resins and carpentry. (ITALY)
SANVIDO
Mounting closures class B15 in the Children’s Area (ITALY).
CARNIVAL CORP.
Supply of stainless steel grids and related accessories (2010 USA).
Supply and mounting of transient parallel system (2010 USA).
IVM
Supply of ceilings open deck on decks 10 and 11.
Supply and replacement of the flooring in the disco ClubO2 (2010 USA).
Carnival Fascination
Works carried out for:
C.E.I.N.
Assistance during dry-dock for maintenance on furnishing (U.S.A.).
Carnival Magic
Works carried out for:
MARINONI
Laying of special materials, resins and carpentry. (ITALY)
F.LLI BUDAI
Mounting of handrails, stairs, floors, covering, doors and other teak products (ITALY).
Supply and installation of carpentry such as ship railings, stairs, banisters and iron coamings (ITALY).
FINCANTIERI
Supply stainless steel and iron parts (ITALY).
Assistance during dry-dock for maintenance on furnishing and electrical system (EU 2011).
Setting up interior design of the pax lifts (2012 USA).
Replacement of spotlight reactors in outdoor decks (2012 USA).
Supply and mounting of electrical system (2012 USA).
Carnival Breeze
Works carried out for:
MARINONI
Laying of special materials, resins and carpentry. (ITALY)
F.LLI BUDAI
Mounting of handrails, stairs, floors, covering, doors and other teak products (ITALY).
Supply and installation of carpentry such as ship railings, stairs, banisters and iron coamings (ITALY).
FINCANTIERI
Supply stainless steel and iron parts (ITALY).
Assistance to Dip Print delivery areas (ITALY).